Electric Rate Schedules

Schedule A-2
General Service - Demand-Metered

Applicability

This schedule is applicable to customers with single-phase or polyphase alternating current service, or to a combination thereof, whose usage during any six months out of the last 12 consecutive months: 1) equals or exceeds 8,000 kWh and 2) is less than 500 kW of monthly demand. Should energy consumption fall below 7,000 kWh for any 6 months out of the most recent 12 consecutive months, Alameda Power & Telecom (Alameda P&T) will bill under Schedule A-1. Customers qualifying for service under this schedule are also eligible for service under Schedule A-1, except those customers with power factors of less than 95%. However, only one rate schedule change is allowed every 12 months except by mutual agreement between the Customer and Alameda P&T.

Rates

Monthly Charges
  Distribution Public Purpose Generation Total
per kWh $0.03193 $0.00300 $0.06427 $0.09920
per kW Metered Demand $5.00 - $4.00 $9.00
per meter $90.00 - - $90.00

State and Local Taxes

To the above charges will be added any applicable state and local taxes (refer to Rider UUT and Rider ERS for current tax rates) and charges for the state solar PV program (refer to Rider PV).

Definitions and Special Conditions

  1. METERED DEMAND
    The Metered Demand is the maximum average power taken per meter during any 15-minute interval in the month, provided that, in case the load is intermittent or subject to violent fluctuations, Alameda P&T may use a 5-minute instead of a 15-minute interval.
  2. DISTRIBUTION CHARGE
    The charge for low voltage delivery of electric power at the local level, including billing and metering costs.
  3. PUBLIC PURPOSE CHARGE
    The California state-mandated charge supporting funding of energy efficiency, new renewable resources, low-income, and research and development programs.
  4. GENERATION CHARGE
    Charge recovering the cost of providing energy supply including generation and transmission costs.
  5. PRIMARY VOLTAGE DISCOUNT
    When the customer owns all the transformers, and delivery hereunder is made at the same voltage as that of the distribution line from which the service is supplied, a discount of 3% for 11 kV or higher available line voltages and 2% for available line voltages of 2 kV to 10 kV will be applied to all charges except taxes, provided, however, Alameda P&T is not required to supply service at a non-standard voltage. Alameda P&T retains the right to change its line voltage at any time, after reasonable advance notice to any customer receiving a discount hereunder and affected by such change, and such customer then has the option to change its system so as to receive service at the new line voltage or to accept service (without discount) through transformers to be supplied by Alameda P&T.
  6. POWER FACTOR
    Charges for any month as computed above will be adjusted for the power factor according to Rider PF.
  7. RULES and REGULATIONS
    Other conditions, as specified in Alameda P&T's Rules and Regulations, shall apply to this electric rate schedule.

ADOPTED:  June 16, 2008
RESOLUTION NO. 4874
(Superseding Rate Schedule A-2 Effective August 1, 2003) 

Effective: July 1, 2008