Schedule A-3
Medium General Service - Demand-Metered
Applicability
This schedule is applicable to customers with polyphase alternating current
service whose demand is equal to or exceeds 500 kW for any six months out of the
last 12 consecutive months. Only one rate schedule change is allowed every 12 months
except by mutual agreement between the Customer and Alameda Power & Telecom
(Alameda P&T).
Rates
| Monthly Charges |
| |
Distribution |
Public Purpose |
Generation |
Total |
| per kWh |
$0.02836 |
$0.00300 |
$0.06202 |
$0.09338 |
| Per kW Metered Demand |
$5.00 |
- |
$4.00 |
$9.00 |
| per meter |
$290.00 |
- |
- |
$290.00 |
State and Local Taxes
To the above charges will be added any applicable state and local taxes (refer to Rider UUT and Rider ERS for current tax rates) and charges for the state solar PV program (refer to Rider PV).
Definitions and Special Conditions
- METERED DEMAND
The Metered Demand in any month is the maximum average power taken per meter during any
15-minute interval in the month, provided that, in cases where the use of energy is
intermittent or subject to violent fluctuations, a 5-minute interval may be used.
- DISTRIBUTION CHARGE
The charge for low voltage delivery of electric power at the local level, including billing
and metering costs.
- PUBLIC PURPOSE CHARGE
The California state-mandated charge supporting funding of energy efficiency, new renewable
resources, low-income, and research and development programs.
- GENERATION CHARGE
Charge recovering the cost of providing energy supply including generation and transmission
costs.
- PRIMARY VOLTAGE DISCOUNT
When the customer owns all the transformers, and delivery hereunder is made at the same
voltage as that of the distribution line from which the service is supplied, a discount of
3% for 11 kV or higher available line voltages and 2% for available line voltages of 2 kV to
10 kV will be applied to all charges except taxes, provided, however, Alameda P&T is not
required to supply service at a non-standard voltage. Alameda P&T retains the right to
change its line voltage at any time, after reasonable advance notice to any customer
receiving a discount hereunder and affected by such change, and such customer then has the
option to change its system so as to receive service at the new line voltage or to accept
service (without discount) through transformers to be supplied by Alameda P&T.
- POWER FACTOR
Charges for any month as computed above will be adjusted for the power factor according to
Rider PF.
- RULES and REGULATIONS
Other conditions, as specified in Alameda P&T's
Rules and Regulations, shall apply to this electric
rate schedule.
ADOPTED: June 16, 2008
RESOLUTION NO. 4784
(Superseding Rate Schedule A-3 Effective August 1, 2003)
|
Effective: July 1, 2008 |
|