Schedule MU-3
Municipal Electric Service - Alameda P&T Accounts
Applicability
This schedule is applicable to electric service rendered to Alameda Power &
Telecom (Alameda P&T).
Rates
- STANDARD METERED SERVICE
| Monthly Charges |
| |
Distribution |
Public Purpose |
Generation |
Total |
| per kWh |
$0.05648 |
$0.00300 |
$0.06736 |
$0.12684 |
| per meter |
$10.00 |
- |
- |
$10.00 |
- UNMETERED UTILITY SERVICE
| Monthly Charges: |
| |
Distribution |
Public Purpose |
Generation |
TOTAL |
| per kWh |
$0.05648 |
$0.00300 |
$0.06736 |
$0.12684 |
| Per service location |
$5.00 |
- |
- |
$5.00 |
State Taxes
To the above charges will be added any applicable state and local taxes (refer to Rider ERS for current tax rate) and charges for the state solar PV program (refer to Rider PV).
Definitions and Special Conditions
- DISTRIBUTION CHARGE
The charge for low voltage delivery of electric power at the local level, including billing
and metering costs.
- PUBLIC PURPOSE CHARGE
The California state-mandated charge supporting funding of energy efficiency, new renewable
resources, low income and research and development programs.
- GENERATION CHARGE
Charge recovering the cost of providing energy supply including generation and transmission
costs.
- UNMETERED UTILITY SERVICE
For multiple locations of essentially identical services, such as nodes/amplifiers for
telecommunications service, remote transmitting units for utility SCADA systems, or cathodic
protection rectifiers for natural gas or water pipelines, where the electric consumption is
roughly consistent at each separate location, Alameda P&T will sample-meter a small
number of locations of such utility service equipment to provide representative usage and
billing data. The remaining locations may be unmetered and will be billed based on either
a) the average consumption measured at the sample-metered site(s), or b) the calculated
consumption estimated from the equipment specifications and usage profile, as determined by
Alameda P&T. The sample-metered site(s) will be billed at the Standard Metered
Service rates, and the remaining unmetered sites will be billed at the Unmetered
Utility Service rates. The customer is required to notify Alameda P&T in the event of
any equipment modifications, upgrades, changes, replacements, or any other event that would
materially impact electrical consumption at the unmetered locations. Alameda P&T
reserves the right to inspect the equipment at each location to verify equipment type,
specifications, or consumption estimates and to ensure the account is being properly billed.
- RULES and REGULATIONS
Other conditions, as specified in Alameda P&T's
Rules and Regulations,
shall apply to this rate schedule.
ADOPTED: June 16, 2008
RESOLUTION NO. 4784
(Superseding Rate Schedule MU-3 Effective August 1, 2003)
|
Effective: July 1, 2008 |
|